Consultant: Fenta Architects
Contractor: Appropriate Technology Construction
Construction of a three (3) storey office complex including meeting hall. Electrical and mechanical facilities including plumbing, drainage, fire alarm, lighting, power and air conditioning. External works comprise of interlocking paving slab pavements and perimeter fence.
Consultant: Fenta Architects
Contractor: Appropriate Technology Construction
Construction of a three (3) storey office complex including meeting/town hall. Electrical and mechanical facilities including plumbing, drainage, fire alarm, lighting, power and air conditioning. External works comprise of interlocking paving slab pavements and side boundary.
Consultant: Masterplan
Contractor: Jarju Kunda Enterprise
The project comprises the construction of a Fire Station building, a 2-bedroom senior staff quarter and two (2) buildings for 12 bedrooms junior staff quarters with attached toilets and kitchen units. External work comprising of a concrete drive way and perimeter fence. Electrical and mechanical facilities including the provision of a solar power system, borehole with elevated concrete water tank.
Consultant: GAP Consultants Contractor: Sarr Construction Group The works consists of the construction of new offices at ground and first floor level and adjacent multi-purpose lecture hall, complete with toilets and kitchenette. External works comprises an apron to the building, concrete pavement for access.
Consultant: GAP Consultants
Contractor: B.B. Electrical & Construction
The project consists of 2- & 3-bedroom apartments for senior staff of the Hospital. Each Unit has bedrooms, sitting and dining room, toilets, front and back verandahs. The external works consists of concrete drive way and an apron to the buildings.
Consultant: GAMTECH Co. Ltd
Contractor: GAI Enterprise
The road is 5 kilometers long and 6 meters wide, it’s a double surface dressing tar road with reinforce concrete of 150 meters at the first part of the road. It starts at the Sukuta/Coastal Road junction and terminates at the entrance of Mariama Kunda Village.
Consultant: GAMTECH Co. Ltd
Contractor: Pinnacle Group
• Primet Street – 1.2 kilometers long and 6 meters wide reinforced concrete road.
• Spalding/Peel Street – 0.7 kilometers long and 6 meters wide reinforced concrete road
• Haddington Street – 0.6 kilometers and 6 meters wide interlocking precast slab pavement.
Consultant: FENTA Architects
Contractor: METALEX
The project comprises the construction of an L shape back-to-back canteen/shops and a market shed building for women vegetables and fruit sellers., concrete pavement and a garbage collection bay at the far-left corner of the market.
Consultant a4A Architects
Contractor: Waterman Afrika
The works consists of the following:
1. Drilling of boreholes including solar powered system and pump;
2. Construction of water distribution network;
3. Construction of 10m3 water tank made of reinforced concrete platform and plastic tanks of 5m3;
4. Construction of public stand pipes including soakways and plumbing works;
5. Construction of chain-link fence at borehole sites
Office Telephone: +220 437 5340
Office Mobile: +220 437 5341
Kanifing Institutional layout Bertil Harding Highway P O Box 2640 Serrekunda, The Gambia, West Africa
Email :info@gamworks.gm
©2023. Gambian Agency For The Management of Public Works (GAMWORKS) | All Rights Reserved. Design & Developed by VW Themes